1. The building shares a water meter with Hollybush Primary School. The School are in the process of arranging their own meter but will continue to use the shared meter until a new meter is installed. The purchaser(s) will be charged for any water they use during the period the drainage is shared. Please refer to the legal pack for further information.
2. The pre-authorisation of the bidding deposit for this lot is £20,000.